London Array Wind Farm

CCI supplied cable engineering expertise to the wind farm during design, manufacture, installation and power cable commissioning. CCI are providing engineering support to London Array during the wind farm's service life.

Client London Array Wind Farm
Location UK
Year 2007

Expertise including:

150kV 3-core export cable manufacturing support including FAT witnessing .

Witnessing of 150kV offshore jointing works.

Witnessing of 150kV subsea/land cable transition jointing works.

Critique and evaluation of infield 33kV T Connector design. Jointer briefings for assembly of 33kV T connectors following the design evaluation.

400kV onshore substation cabling works .

DTS technical support (specification / procurement FAT witnessing / commissioning and SAT witnessing / operational support).