— Land cable engineering

Moray West Offshore Windfarm

Since 2021 CCI have been providing cable engineering and inspection services for the Moray West Windfarm's 66kV (inter array) and 220kV (export) land and subsea cable systems. CCI are also providing technical and inspection services for cable accessories and fibre optic cable. The windfarm is expected to be commissioned in 2024.

Client Moray Offshore Windfarm (West) Ltd
Location UK
Year 2021

CCI supported the Moray West team with technical assessment of 66kV and 220kV cable system manufacturers. CCI performed technical audits on the manufacturing locations for power cable, power cable accessories and fibre optic cable.

CCI also provided cable engineering design assurance support for power cable design,  manfacturing inspections and factory acceptance testing.

During cable manufacture CCI reviewed and advised Moray West on product technical quality.